+1 (888) 467-7463 [email protected]
Find a Distributor | 24/7 Support
Blog

My $2,140 Storm Kit Mistake: A Fluke 189, a Generac 5500, and a $6 Phone Charger

August 27, 2021. I had a sourcing spreadsheet open on one monitor and three tabs of marketplace listings on the other. Hurricane Ida was two days out, our field kits were half-stocked, and I had $3,000 of approved budget sitting in my inbox.

I felt good about it. That's the part that still stings.

I've been handling electrical test equipment and field gear orders for nine years. In that time I've personally made — and written down — six significant purchasing mistakes totaling roughly $4,300 in wasted budget. Three of them happened in the same week. This is that week.

What I assumed going in

My working theory was painfully simple: a multimeter is a multimeter, a generator is a generator, and a phone charger is a two-dollar part. Buy the cheapest listing with decent photos and move on.

Nine years later, that sentence makes me wince. But at the time it wasn't a philosophy. It was just a row in a spreadsheet.

Mistake #1: The Fluke 189 that "looked new"

We needed one more true-RMS meter for the storm crew. I found a listing for a Fluke 189 multimeter — "new in box, never used" — at $310, roughly $180 under everything else I'd seen that week. The photos were clean. The seller had 400-plus reviews. I clicked buy.

Here's what I didn't know: the Fluke 189 was discontinued years ago. Fluke's own handheld line moved to the 289, and that's what they've been selling for the better part of two decades. A "new in box" 189 in 2021 isn't impossible — it's just a claim that needs a serial number and a calibration record behind it, not a stock photo.

The unit showed up in a box that had been re-taped. No certificate. I called our calibration lab and asked what a one-year cert would cost if they could still service that model. "Send it in, we'll test it," they said.

It came back out of spec on DC volts. Not wildly. But enough that I couldn't put it on a job where we were reading generator output and signing off on the numbers.

$310 for the meter. $85 for the calibration attempt. A week of a crew borrowing our other meters. Call it $395, plus the small humiliation of explaining it at the Monday meeting.

What most people don't realize is that a calibration certificate isn't paperwork. It's the thing that tells you the number on the screen is the number at the probe. On any digital multimeter — Fluke or otherwise — that paper trail is the product. You're not buying a screen. You're buying agreement with a reference standard.

Mistake #2: The Generac portable generator 5500, and the watts I never verified

We ordered a Generac portable generator 5500 for the shop's backup position. The listing headline said 5500. I read that as "5,500 watts," wrote it into the load sheet, and moved on with my life.

Two things I should have caught, and one I flat-out didn't know:

  • The number in a generator's model name is usually running watts. Starting, or surge, watts are higher — and Generac publishes both figures on the spec sheet. I just never opened it. Our load calc happened to work, but only by luck. If we'd been starting a bigger compressor, we'd have tripped a breaker on day one and looked like amateurs in front of the customer.
  • The listing didn't include the wheel kit or the battery. Neither showed up in the photos because neither was in the photos. Add about $130 for the kit and $95 for the battery, and the "cheap" listing stopped being cheap.
  • Break-in oil changes come early — typically within the first 20 hours of run time, but it varies by model, so read the manual. We ran ours for fourteen hours straight before somebody asked why the oil looked like tar. That one cost $40 in oil and $0 in damage. It could have gone the other way.

Mistake #3: The $6 phone battery charger

Ida made landfall on August 29. By day three, our phones were the bottleneck — dispatch, photos, torque spec lookups, all of it running through a phone. Two chargers had already died. They were from a 3-pack someone grabbed at a convenience store on the way out of town.

At one point I typed "where to buy a battery charger" into my phone with 18% battery left and got back three pages of marketplace listings, and not one of them listed output amperage. That's the tell, by the way. If a phone battery charger listing won't tell you how many amps it puts out, it's not a charger — it's a resistor with a USB port glued to it.

We eventually found a pair of 20W chargers at an auto parts store. $28 each. They survived the rest of the deployment and they're still in the shop's go-bag three years later.

The math is stupid in hindsight: $18 for the 3-pack that died inside 48 hours, $56 for the pair that worked. I spent more on the cheap ones in one week than the good ones cost me across three years.

Where it landed

Total damage from that stretch: $395 on the meter, about $225 on generator accessories I hadn't budgeted for, and roughly $60 on chargers bought twice. Add the overtime we burned re-running load calcs and chasing down a loaner meter, and the week came in somewhere around $2,140 in avoidable cost.

None of it was a catastrophe. All of it was avoidable. That's the worst combination, honestly — big enough to hurt, small enough that nobody stops you from doing it again.

What I check now — the three-line rule

I wrote a short pre-check that sits at the top of every equipment request. Three lines. Copy-paste. It's caught 47 potential issues in the 18 months since I put it in writing, and two of those would have been four-figure problems.

  1. What's NOT in the box? Wheel kit, battery, test leads, cert, case, cord. Ask before you compare prices, not after.
  2. Is this product still current? If the manufacturer's own site doesn't list it anymore, the "new" listing needs a serial number and a paper trail. No exceptions, no matter how good the photos are.
  3. What's the total after the second purchase? The charger, the cord, the cert, the recalibration. If that number is worse than the higher-priced listing, you already have your answer.

Look, I'm not saying the expensive listing is always the better buy. I'm not saying budget gear is a scam either — we still run plenty of it. I'm saying the listing that tells you everything up front, including what isn't included, usually costs less by the time the job closes out. The vendor who lists every fee before you ask has never once been the one who shipped me a re-taped box.

The $310 meter taught me that. So did the $6 charger — which, somehow, is the more embarrassing of the two.

Pricing above reflects what I paid in August–September 2021 and what public listings showed at that time. Check current pricing before you order. Generator running vs. starting wattage, break-in service intervals, and calibration recommendations all vary by model — confirm against the manufacturer's documentation for your specific unit.

Share: LinkedIn Twitter WhatsApp
author-avatar
Ingrid Bauer

Ingrid Bauer is an industrial automation and electromechanical systems analyst specializing in variable-frequency drives, motors, pumps, and complete power-drive systems. She applies IEC 61800-9-2 drive-efficiency methods, IEC 60034-30-1 motor efficiency classes, and ISO 9906 pump tests while examining torque-speed duty, harmonics, head, flow, and operating-point efficiency. She helps engineers size drive and pump combinations for real load profiles, cable lengths, ambient conditions, process control, energy use, and maintenance access.

Leave a Reply